top of page


Anaerobic Digester Case study: powering HGVs with bio-methane
From an anaerobic digester to green HGV's, E4environment assists with the planning and permitting required to make it happen.
HC
Aug 30, 20221 min read
49 views
0 comments


Case Study: ground source heat pump installation
In 2019, E4environment Ltd gained planning permission for a Shropshire farmer to install two Ground Source Heat Pumps (GSHPs) intended to...
HC
Aug 22, 20221 min read
49 views
0 comments


Anaerobic Digester installation - our experience
E4environment Ltd has decades of experience assisting with anaerobic digester projects nationwide, from Cornwall to Scotland.
HC
Aug 9, 20221 min read
136 views
0 comments
bottom of page